Converted this room from a wasted space through Nov/Dec 15 at our current residence in Berkshire, UK.
Project consisted underpinning outer walls, knock through exterior wall and integrate to main house, remove dilapidated patio doors and brick over, replaced polycarb roof with proper insulated and tiled roof + bespoke storage fitted to our unique design spec.
Project took 7 weeks e-2-e (1 1/2 week delay due to issues with glaziers)
Family really happy with the end result.
Design work by WaterMeere studios
Project management by talks.trade
Converted this room from a wasted space through Nov/Dec 15 at our current residence in Berkshire, UK. Project consisted underpinning outer walls, knock through exterior wall and integrate to main house, remove dilapidated patio doors and brick over, replaced polycarb roof with proper insulated and tiled roof + bespoke storage fitted to our unique design spec. Project took 7 weeks e-2-e (1 1/2 week delay due to issues with glaziers) Family really happy with the end result. Design work by WaterMeere studios Project management by talks.trade
Q