Stunning! How long did project take?

Urban Landscape
10 år sedan
Fireplaces · Mer info

Kommentarer (2)

  • PRO
    Turn Key Remodel
    10 år sedan
    Ändrades senast: 10 år sedan
    This project was a whole house remodel that took a few months, however most fireplace remodels of this scope are completed within a week. We manufacture all of the woodwork at our facility while installing the tile or slab material on-site. Upon completion of the tile or slab installation, the woodwork follows and is typically a 1-day install. Sometimes flooring, baseboard, electrical for TV's, drywall and paint are necessary.
  • PRO
    Urban Landscape
    Författare
    10 år sedan
    Wow lots to do but looks great! Thanks for reply and info
Sponsored

Reload the page to not see this specific ad anymore

Sverige
Skräddarsy min upplevelse genom att använda cookies

Houzz använder cookies och liknande teknik för att anpassa min upplevelse med relevant innehåll och det bästa Houzz produkter och tjänster kan erbjuda mig. Genom att klicka 'Acceptera' accepterar jag detta, så som det vidare beskrivs i Houzz Cookie Policy. Jag kan avvisa icke-essentiella cookies genom att klicka 'Administrera preferenser'.