New bathroom
The space used to be a walk-in closed and needed to be reconstructed to house a new bathroom. The layout needed to include a double sink, built-in bath, wall hung WC with concealed cistern, large towel rail and large walk-in shower. Underfloor heating and mirror de-mister have also been integrated, as well as new lighting (in compliance with current regulations)
Delphine Collard